ITAC Assessment: UD0445
ITAC logo
ITAC Assessment: UD0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product motor vehicle body side molding
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,200
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,500 1,762,016
kWh
Natural Gas $7,257 1,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $262 - $262
10,551
kWh
- -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,105 $1,500 $1,105
44,256
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,283 $1,845 $972
18,757
kWh
$(-200.0)
-
MMBtu
$511
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,287 $1,920 $1,321
29,601
kWh
$(-314.0)
-
MMBtu
$280
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,835 $10,000 $7,435
99,941
kWh
$(-1,600.0)
-
MMBtu
-
TOTAL RECOMMENDED $9,772 $15,265 $11,095
203,106
kWh
$(-2,114.0)
-
MMBtu
$791
TOTAL IMPLEMENTED $9,772 $15,265 $11,095
203,106
kWh
$(-2,114.0)
-
MMBtu
$791
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs