ITAC Assessment: UD0433
ITAC logo
ITAC Assessment: UD0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product commercial printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 166
Plant Area 92,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,999 5,318,875
kWh
Natural Gas $39,112 6,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4131: Size electric motors for peak operating efficiency $6,342 $20,000 $895
24,033
kWh
- $5,447
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,410 - $4,410
70,047
kWh
- -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,059 $300 $2,059
55,100
kWh
- -
04 2.2437: Recover waste heat from equipment $1,093 $2,500 - $1,093
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,315 $1,950 $1,246
22,567
kWh
- $69
TOTAL RECOMMENDED $15,219 $24,750 $8,610
171,747
kWh
$1,093
-
MMBtu
$5,516
TOTAL IMPLEMENTED $7,784 $2,250 $7,715
147,714
kWh
- $69
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs