ITAC Assessment: UD0416
ITAC logo
ITAC Assessment: UD0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Steel Waste receptacles
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,340
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,133 1,381,594
kWh
Natural Gas $153,950 42,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $2,440 - $2,440
-
kWh
-
02 2.8113: Purchase gas directly from a contract gas supplier $17,440 $20,000 - $17,440
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,163 $2,170 $1,163
14,654
kWh
-
04 2.2422: Use waste heat from hot flue gases to generate steam $9,061 $3,000 $8,026
252,345
kWh
$1,035
-
MMBtu
05 2.6218: Turn off equipment when not in use $2,209 - - $2,209
-
MMBtu
TOTAL RECOMMENDED $32,313 $25,170 $11,629
266,999
kWh
$20,684
-
MMBtu
TOTAL IMPLEMENTED $10,224 $5,170 $9,189
266,999
kWh
$1,035
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs