ITAC Assessment: UD0344
ITAC logo
ITAC Assessment: UD0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ORGANIC CHEMICALS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area
n/a
Annual Production 70,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $646,567 19,321,220
kWh
Natural Gas $1,048,836 311,928
MMBtu
Fuel Oil #2 $61,749 16,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $16,902 $5,000 - $16,902
-
MMBtu
-
02 2.2121: Increase amount of condensate returned $20,762 - - $15,315
-
MMBtu
$5,447
03 2.1321: Replace fossil fuel equipment with electrical equipment $5,492 - $(-12,156.0)
(-332,943)
kWh
$12,648
-
MMBtu
$5,000
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,529 - $6,020
212,192
kWh
$(-810.0)
-
MMBtu
$319
TOTAL RECOMMENDED $48,685 $5,000 $(-6,136.0)
(-120,751)
kWh
$44,055
-
MMBtu
$10,766
TOTAL IMPLEMENTED $48,685 $5,000 $(-6,136.0)
(-120,751)
kWh
$44,055
-
MMBtu
$10,766
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs