ITAC Assessment: UD0255
ITAC logo
ITAC Assessment: UD0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product OUTDOOR SIGNS
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,332 1,097,011
kWh
Natural Gas $38,540 6,914
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3511: Use plant owned transformers or lease transformers $7,000 $8,000 $8,040
-
kWh
- $(-1,040.0)
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $1,509 $13 $171
6,155
kWh
$1,338
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $1,435 $2,000 - $1,435
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $350 - $320
3,810
kWh
- $30
TOTAL RECOMMENDED $10,294 $10,013 $8,531
9,965
kWh
$2,773
-
MMBtu
$(-1,010.0)
TOTAL IMPLEMENTED $350 - $320
3,810
kWh
- $30
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs