ITAC Assessment: UD0247
ITAC logo
ITAC Assessment: UD0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product METAL STAMPINGS & ASSEMBLIES
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,983 1,509,086
kWh
Natural Gas $28,911 6,119
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,553

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8112: Combine utility meters $1,416 $3,000 - $1,416
-
MMBtu
-
02 3.4156: Use flow control valves on equipment to optimize water use $1,816 - - - $1,816
03 2.7142: Utilize higher efficiency lamps and/or ballasts $818 $2,000 $593
5,275
kWh
- $225
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,332 $1,500 $1,131
9,965
kWh
$(-99.0)
-
MMBtu
$300
05 2.3136: Overlap custodial services with normal day hours $1,405 $76 $1,245
24,619
kWh
- $160
TOTAL RECOMMENDED $6,787 $6,576 $2,969
39,859
kWh
$1,317
-
MMBtu
$2,501
TOTAL IMPLEMENTED $4,553 $1,576 $2,376
34,584
kWh
$(-99.0)
-
MMBtu
$2,276
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs