| Assessment Year | 1986 |
|---|---|
| Principal Product | BUILDING COMPONENTS |
| NAICS |
n/a
|
| SIC | 2452: Prefabricated Wood Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 82 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,690 | 1,325,909 |
kWh
|
$0.065 |
| Natural Gas | $63,146 | 12,820 |
MMBtu
|
$4.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,711 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7492: Use proper thickness of insulation on building envelope | $4,191 | $15,000 | - |
$4,191
-
MMBtu
|
|
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,221 | $1,000 |
$841
21,102
kWh
|
$380
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,499 | $4,200 |
$5,499
77,960
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,021 | $100 | - |
$1,021
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,888 | $2,956 |
$2,041
34,584
kWh
|
$(-153.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $13,820 | $23,256 |
$8,381
133,646
kWh
|
$5,439
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,711 | $19,300 |
$5,499
77,960
kWh
|
$5,212
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs