ITAC Assessment: UD0203
ITAC logo
ITAC Assessment: UD0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BUILDING COMPONENTS
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,690 1,325,909
kWh
Natural Gas $63,146 12,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $4,191 $15,000 - $4,191
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $1,221 $1,000 $841
21,102
kWh
$380
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,499 $4,200 $5,499
77,960
kWh
-
04 2.2437: Recover waste heat from equipment $1,021 $100 - $1,021
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,888 $2,956 $2,041
34,584
kWh
$(-153.0)
-
MMBtu
TOTAL RECOMMENDED $13,820 $23,256 $8,381
133,646
kWh
$5,439
-
MMBtu
TOTAL IMPLEMENTED $10,711 $19,300 $5,499
77,960
kWh
$5,212
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs