Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product TOOLS,DIES,JIGS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 122
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,407 1,385,111
kWh
Natural Gas $21,133 3,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,294 $3,569 $2,885
55,686
kWh
$(-594.0)
-
MMBtu
$1,003
02 2.7226: Use computer programs to optimize hvac performance $630 $2,000 $630
22,567
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $534 $2,000 $708
7,034
kWh
$(-174.0)
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $707 - $1,157
-
kWh
- $(-450.0)
TOTAL RECOMMENDED $5,165 $7,569 $5,380
85,287
kWh
$(-768.0)
-
MMBtu
$553
TOTAL IMPLEMENTED $3,924 $5,569 $3,515
78,253
kWh
$(-594.0)
-
MMBtu
$1,003
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs