ITAC Assessment: UD0137
ITAC logo
ITAC Assessment: UD0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ELECTRICAL EQUIPMENT
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $5
M
to 10
M
# of Employees 131
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,546 684,349
kWh
Natural Gas $19,871 3,562
MMBtu
Fuel Oil #2 $29,038 5,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2511: Insulate bare equipment $6,700 $3,000 $6,700
109,027
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $809 $1,894 $965
11,723
kWh
$(-156.0)
-
MMBtu
TOTAL RECOMMENDED $7,509 $4,894 $7,665
120,750
kWh
$(-156.0)
-
MMBtu
TOTAL IMPLEMENTED $6,700 $3,000 $6,700
109,027
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs