ITAC Assessment: UD0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FABRICATED METAL PRODUCT
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 224
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 1,920
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,962 1,514,068
kWh
Natural Gas $229,998 39,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7494: Install storm windows and doors $30,317 $42,568 - $30,317
-
MMBtu
02 2.2211: Use optimum temperature $662 $1,000 - $662
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,093 $239 $1,278
26,671
kWh
$(-185.0)
-
MMBtu
04 2.2491: Use cooling air which cools hot work pieces for space heating $1,013 $3,000 - $1,013
-
MMBtu
05 2.4322: Use or replace with energy efficient substitutes $5,490 $35,000 - $5,490
-
MMBtu
06 2.2443: Re-use or recycle hot or cold process exhaust air $1,350 $4,000 - $1,350
-
MMBtu
TOTAL RECOMMENDED $39,925 $85,807 $1,278
26,671
kWh
$38,647
-
MMBtu
TOTAL IMPLEMENTED $32,072 $43,807 $1,278
26,671
kWh
$30,794
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs