| Assessment Year | 1984 |
|---|---|
| Principal Product | RUBBER PRODUCTS |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 430 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $417,555 | 8,573,857 |
kWh
|
$0.049 |
| Natural Gas | $86,105 | 15,489 |
MMBtu
|
$5.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,612 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $20,480 | $5,070 |
$(-6,613.0)
(-135,698)
kWh
|
$27,093
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,818 | $900 |
$2,897
69,754
kWh
|
$(-1,079.0)
-
MMBtu
|
|
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $852 | - |
$852
-
kWh
|
- | |
| 04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,038 | $4,000 | - |
$2,038
-
MMBtu
|
|
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $7,377 | $33,750 | - |
$7,377
-
MMBtu
|
|
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,899 | - |
$4,899
120,750
kWh
|
- | |
| TOTAL RECOMMENDED | $37,464 | $43,720 |
$2,035
54,806
kWh
|
$35,429
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $36,612 | $43,720 |
$1,183
54,806
kWh
|
$35,429
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs