ITAC Assessment: UD0114
ITAC logo
ITAC Assessment: UD0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 430
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,555 8,573,857
kWh
Natural Gas $86,105 15,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,612

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4321: Upgrade obsolete equipment $20,480 $5,070 $(-6,613.0)
(-135,698)
kWh
$27,093
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,818 $900 $2,897
69,754
kWh
$(-1,079.0)
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $852 - $852
-
kWh
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $2,038 $4,000 - $2,038
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $7,377 $33,750 - $7,377
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $4,899 - $4,899
120,750
kWh
-
TOTAL RECOMMENDED $37,464 $43,720 $2,035
54,806
kWh
$35,429
-
MMBtu
TOTAL IMPLEMENTED $36,612 $43,720 $1,183
54,806
kWh
$35,429
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs