ITAC Assessment: UD0111
ITAC logo
ITAC Assessment: UD0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PAINT AND COATINGS
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,808
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,932 1,987,691
kWh
Natural Gas $152,619 31,174
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $992 $600 $992
31,067
kWh
-
02 2.7492: Use proper thickness of insulation on building envelope $27,776 $2,095 $779
14,068
kWh
$26,997
-
MMBtu
03 2.7494: Install storm windows and doors $4,375 $2,890 - $4,375
-
MMBtu
04 2.7494: Install storm windows and doors $928 $1,200 - $928
-
MMBtu
05 2.4133: Use most efficient type of electric motors $1,592 $3,511 $1,592
22,274
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,626 $1,590 $10,017
161,782
kWh
$(-2,391.0)
-
MMBtu
TOTAL RECOMMENDED $43,289 $11,886 $13,380
229,191
kWh
$29,909
-
MMBtu
TOTAL IMPLEMENTED $6,295 $4,690 $992
31,067
kWh
$5,303
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs