ITAC Assessment: UD0077
ITAC logo
ITAC Assessment: UD0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ELECTROPLATING,ANODIZING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,652 1,923,212
kWh
Natural Gas $153,568 33,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $963 $354 $1,135
20,809
kWh
$(-172.0)
-
MMBtu
02 2.1221: Replace obsolete burners with more efficient ones $3,987 $2,000 - $3,987
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,967 $500 - $3,967
-
MMBtu
04 2.7421: Reduce glazed areas in buildings $1,268 $3,680 - $1,268
-
MMBtu
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,515 - $3,515
23,447
kWh
-
TOTAL RECOMMENDED $13,700 $6,534 $4,650
44,256
kWh
$9,050
-
MMBtu
TOTAL IMPLEMENTED $7,954 $2,500 - $7,954
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs