Assessment Year | 2018 |
---|---|
Principal Product | Ink |
NAICS | 325910: Printing Ink Manufacturing |
SIC | 2893: Printing Ink |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
100,000
ft2
|
Annual Production | 18,000,000
ton
|
Production Hrs. Annual | 4,719
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,194 | 1,251,000 |
kWh
|
$0.077 |
Electricity Fees | $17,864 | - |
|
- |
TOTAL YEARLY COSTS | $114,058 | |||
RECOMMENDED SAVINGS* | $35,129 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,432 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,588 | $24,837 |
$18,464
243,296
kWh
|
$1,124 | |
02 | 2.6218: Turn off equipment when not in use | $2,572 | $1,253 |
$2,425
31,536
kWh
|
$147 | |
03 | 2.7134: Use photocell controls | $2,331 | $707 |
$2,197
28,577
kWh
|
$134 | |
04 | 2.7135: Install occupancy sensors | $1,309 | $2,048 |
$1,234
16,054
kWh
|
$75 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,642 | $1,165 |
$3,433
44,651
kWh
|
$209 | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,214 | $250 |
$1,144
14,879
kWh
|
$70 | |
07 | 2.4133: Use most efficient type of electric motors | $2,316 | $2,353 |
$2,183
28,386
kWh
|
$133 | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $150 | $258 |
$142
1,850
kWh
|
$8 | |
09 | 2.2437: Recover waste heat from equipment | $2,007 | $1,612 |
$1,892
24,613
kWh
|
$115 | |
TOTAL RECOMMENDED | $35,129 | $34,483 |
$33,114
433,842
kWh
|
$2,015 | ||
TOTAL IMPLEMENTED | $7,432 | $4,178 |
$7,006
91,132
kWh
|
$426 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs