Assessment Year | 2015 |
---|---|
Principal Product | ceramic tile |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3253: Ceramic Wall and Floor Tile |
Sales Range | $100 M to 500M |
# of Employees | 210 |
Plant Area |
535,000
ft2
|
Annual Production | 60,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,410,656 | 34,809,355 |
kWh
|
$0.041 |
Electricity Demand | $825,366 | 63,840 |
kW-mo/yr
|
$12.93 |
Electricity Fees | $(-11,900.0) | - |
|
- |
Natural Gas | $2,976,762 | 691,451 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $335,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,656 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $276,882 | $132,605 |
$81,397
2,008,318
kWh
|
$35,568
-
kW-mo/yr
|
$(-749.0) | $160,666 | |
02 | 2.7134: Use photocell controls | $1,325 | $905 |
$1,334
32,906
kWh
|
- | $(-9.0) | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,331 | $3,245 |
$16,215
400,074
kWh
|
$7,266
-
kW-mo/yr
|
$(-150.0) | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $23,335 | $800 |
$15,914
392,642
kWh
|
$7,571
-
kW-mo/yr
|
$(-150.0) | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,638 | $4,800 |
$10,707
264,169
kWh
|
- | $(-69.0) | - | |
TOTAL RECOMMENDED | $335,511 | $142,355 |
$125,567
3,098,109
kWh
|
$50,405
-
kW-mo/yr
|
$(-1,127.0) | $160,666 | ||
TOTAL IMPLEMENTED | $24,656 | $4,150 |
$17,549
432,980
kWh
|
$7,266
-
kW-mo/yr
|
$(-159.0) | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs