ITAC Assessment: UA0047
ITAC logo
ITAC Assessment: UA0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product polystyrene
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range less than $500
k
# of Employees 59
Plant Area 350,000
ft2
Annual Production 330,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,165,771 21,419,405
kWh
Electricity Demand $509,736 34,181
kW-mo/yr
Natural Gas $338,457 31,466
MMBtu
Other Energy $445,183 66,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $630,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $427,575 $685,000 $332,542
5,999,308
kWh
$122,560
-
kW-mo/yr
- $228,077
-
MMBtu
- $(-255,604.0)
02 2.7124: Make a practice of turning off lights when not needed $1,473 - $1,473
26,582
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $10,635 $740 $7,611
137,320
kWh
$3,024
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,938 $75,000 $21,938
398,871
kWh
- - - - -
05 3.4151: Minimize water usage $12,306 $8,325 $(-3,260.0)
(-58,814)
kWh
$(-2,002.0)
-
kW-mo/yr
- - $17,568
-
Tgal
-
06 2.2161: Optimize operation of multi-stage vacuum steam jets $155,078 $222,874 $(-27,531.0)
(-496,657)
kWh
$(-12,565.0)
-
kW-mo/yr
- $195,174
-
MMBtu
- -
07 2.2511: Insulate bare equipment $1,140 $713 - - $1,140
-
MMBtu
- - -
TOTAL RECOMMENDED $630,145 $992,652 $332,773
6,006,610
kWh
$111,017
-
kW-mo/yr
$1,140
-
MMBtu
$423,251
-
MMBtu
$17,568
-
Tgal
$(-255,604.0)
TOTAL IMPLEMENTED $12,306 $8,325 $(-3,260.0)
(-58,814)
kWh
$(-2,002.0)
-
kW-mo/yr
- - $17,568
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs