ITAC Assessment: TT0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive Foam
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 160,000
ft2
Annual Production 2,600,000
pieces
Production Hrs. Annual 6,144
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $564,962 9,293,184
kWh
Electricity Demand $235,236 18,057
kW-mo/yr
Natural Gas $260,057 39,062
MMBtu
Waste Disposal Costs
Water Usage $4,316 630,000
Tgal
Water Disposal $4,442 630
Tgal
TOTAL YEARLY COSTS $1,069,013
RECOMMENDED SAVINGS* $58,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,229

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,943 $5,000 $16,878
277,603
kWh
$5,065
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,190 $13,430 - - $10,190 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,772 $12,000 $6,177
101,592
kWh
$2,595
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $8,523 $15,000 - - - $8,523
-
MMBtu
05 2.3212: Optimize plant power factor $5,315 $24,000 - $5,315
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,229 $9,752 $3,271
53,787
kWh
$958
-
kW-mo/yr
- -
TOTAL RECOMMENDED $58,972 $79,182 $26,326
432,982
kWh
$13,933
-
kW-mo/yr
$10,190 $8,523
-
MMBtu
TOTAL IMPLEMENTED $4,229 $9,752 $3,271
53,787
kWh
$958
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs