Assessment Year | 2015 |
---|---|
Principal Product | Expanded Poly Styrene |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
162,000
ft2
|
Annual Production | 44,000
thousand feet
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,182 | 873,640 |
kWh
|
$0.069 |
Electricity Demand | $16,956 | 3,591 |
kW-mo/yr
|
$4.72 |
Natural Gas | $91,752 | 10,900 |
MMBtu
|
$8.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,811 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $875 | $750 | - | - |
$875
-
MMBtu
|
|
02 | 2.2113: Repair or replace steam traps | $5,772 | $430 | - | - |
$5,772
-
MMBtu
|
|
03 | 2.2113: Repair or replace steam traps | $1,127 | $230 | - | - |
$1,127
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $606 | $567 | - | - |
$606
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $430 | $660 | - | - |
$430
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,163 | $2,500 |
$1,163
16,903
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,166 | $3,000 |
$1,166
16,958
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $432 | $63 |
$328
4,772
kWh
|
$104
-
kW-mo/yr
|
- | |
09 | 2.7134: Use photocell controls | $151 | $90 |
$151
2,190
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $124 | $413 |
$115
1,681
kWh
|
$9
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,330 | $16,510 |
$8,682
126,187
kWh
|
$2,648
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $23,176 | $25,213 |
$11,605
168,691
kWh
|
$2,761
-
kW-mo/yr
|
$8,810
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,811 | $18,486 |
$9,276
134,830
kWh
|
$2,761
-
kW-mo/yr
|
$7,774
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs