ITAC Assessment: TT0101
ITAC logo
ITAC Assessment: TT0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product S-205 / BK-305 / BK-400
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 66,674
ft2
Annual Production 1,500
units
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,459 5,096,400
kWh
Electricity Demand $143,054 10,356
kW-mo/yr
Electricity Fees $9,924 -
Natural Gas $150,725 26,366
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2112: Use correct size steam traps $33,071 $12,000 - - $33,071
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,315 $3,000 $14,727
247,517
kWh
$5,588
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,527 $45,923 $6,716
112,908
kWh
$4,184
-
kW-mo/yr
- $1,627
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,915 $12,372 $460
7,730
kWh
$920
-
kW-mo/yr
- $535
05 2.7142: Utilize higher efficiency lamps and/or ballasts $617 $2,994 $104
1,746
kWh
$334
-
kW-mo/yr
- $179
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,803 $15,990 $1,235
20,748
kWh
$787
-
kW-mo/yr
- $(-219.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,046 $13,216 $1,300
21,840
kWh
$827
-
kW-mo/yr
- $(-81.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,439 $714 $470
7,904
kWh
$252
-
kW-mo/yr
- $717
09 2.7142: Utilize higher efficiency lamps and/or ballasts $114 $764 $64
1,082
kWh
$36
-
kW-mo/yr
- $14
10 2.7135: Install occupancy sensors $8,082 $6,528 $8,082
135,832
kWh
- - -
11 2.7233: Use properly designed and sized hvac equipment $6,395 $100,000 $6,395
72,667
kWh
- - -
TOTAL RECOMMENDED $88,324 $213,501 $39,553
629,974
kWh
$12,928
-
kW-mo/yr
$33,071
-
MMBtu
$2,772
TOTAL IMPLEMENTED $53,386 $15,000 $14,727
247,517
kWh
$5,588
-
kW-mo/yr
$33,071
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs