| Assessment Year | 2012 |
|---|---|
| Principal Product | S-205 / BK-305 / BK-400 |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
66,674
ft2
|
| Annual Production | 1,500
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $303,459 | 5,096,400 |
kWh
|
$0.060 |
| Electricity Demand | $143,054 | 10,356 |
kW-mo/yr
|
$13.81 |
| Electricity Fees | $9,924 | - |
|
- |
| Natural Gas | $150,725 | 26,366 |
MMBtu
|
$5.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $53,386 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2112: Use correct size steam traps | $33,071 | $12,000 | - | - |
$33,071
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,315 | $3,000 |
$14,727
247,517
kWh
|
$5,588
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,527 | $45,923 |
$6,716
112,908
kWh
|
$4,184
-
kW-mo/yr
|
- | $1,627 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,915 | $12,372 |
$460
7,730
kWh
|
$920
-
kW-mo/yr
|
- | $535 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $617 | $2,994 |
$104
1,746
kWh
|
$334
-
kW-mo/yr
|
- | $179 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,803 | $15,990 |
$1,235
20,748
kWh
|
$787
-
kW-mo/yr
|
- | $(-219.0) | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,046 | $13,216 |
$1,300
21,840
kWh
|
$827
-
kW-mo/yr
|
- | $(-81.0) | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,439 | $714 |
$470
7,904
kWh
|
$252
-
kW-mo/yr
|
- | $717 | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $114 | $764 |
$64
1,082
kWh
|
$36
-
kW-mo/yr
|
- | $14 | |
| 10 | 2.7135: Install occupancy sensors | $8,082 | $6,528 |
$8,082
135,832
kWh
|
- | - | - | |
| 11 | 2.7233: Use properly designed and sized hvac equipment | $6,395 | $100,000 |
$6,395
72,667
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $88,324 | $213,501 |
$39,553
629,974
kWh
|
$12,928
-
kW-mo/yr
|
$33,071
-
MMBtu
|
$2,772 | ||
| TOTAL IMPLEMENTED | $53,386 | $15,000 |
$14,727
247,517
kWh
|
$5,588
-
kW-mo/yr
|
$33,071
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs