Assessment Year | 2009 |
---|---|
Principal Product | Hadwood Flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
110,000
ft2
|
Annual Production | 30,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $772,343 | 19,364,517 |
kWh
|
$0.040 |
Electricity Demand | $465,094 | 52,808 |
kW-mo/yr
|
$8.81 |
Electricity Fees | $198,987 | - |
|
- |
Natural Gas | $31,482 | 2,367 |
MMBtu
|
$13.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $258,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $150,000 | $300,000 |
$150,000
1,923,720
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $51,800 | $70,235 |
$42,800
576,876
kWh
|
$1,120
-
kW-mo/yr
|
$7,880 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $36,040 | $97,150 |
$28,370
382,337
kWh
|
$740
-
kW-mo/yr
|
$6,930 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,090 | $6,225 |
$5,220
70,395
kWh
|
$140
-
kW-mo/yr
|
$730 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,080 | $8,270 |
$3,030
40,884
kWh
|
$80
-
kW-mo/yr
|
$970 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,750 | $2,900 |
$10,750
124,220
kWh
|
- | - | |
TOTAL RECOMMENDED | $258,760 | $484,780 |
$240,170
3,118,432
kWh
|
$2,080
-
kW-mo/yr
|
$16,510 | ||
TOTAL IMPLEMENTED | $10,750 | $2,900 |
$10,750
124,220
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs