ITAC Assessment: TT0037
ITAC logo
ITAC Assessment: TT0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Hadwood Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 110,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $772,343 19,364,517
kWh
Electricity Demand $465,094 52,808
kW-mo/yr
Electricity Fees $198,987 -
Natural Gas $31,482 2,367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $258,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $150,000 $300,000 $150,000
1,923,720
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $51,800 $70,235 $42,800
576,876
kWh
$1,120
-
kW-mo/yr
$7,880
03 2.7142: Utilize higher efficiency lamps and/or ballasts $36,040 $97,150 $28,370
382,337
kWh
$740
-
kW-mo/yr
$6,930
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,090 $6,225 $5,220
70,395
kWh
$140
-
kW-mo/yr
$730
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,080 $8,270 $3,030
40,884
kWh
$80
-
kW-mo/yr
$970
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,750 $2,900 $10,750
124,220
kWh
- -
TOTAL RECOMMENDED $258,760 $484,780 $240,170
3,118,432
kWh
$2,080
-
kW-mo/yr
$16,510
TOTAL IMPLEMENTED $10,750 $2,900 $10,750
124,220
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs