ITAC Assessment: TR0039
ITAC logo
ITAC Assessment: TR0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 164,550
ft2
Annual Production 2,737,500
Tgal
Production Hrs. Annual 8,544
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,065 833,940
kWh
Electricity Demand $9,910 2,478
kW-mo/yr
Electricity Fees $1,020 -
TOTAL YEARLY COSTS $75,996
RECOMMENDED SAVINGS* $256,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $512 $375 $478
5,980
kWh
$34
-
kW-mo/yr
-
02 3.8121: Cover containers to minimize evaporative losses $187,890 $1,576,666 - - $187,890
03 2.9114: Use solar heat to make electricty $68,177 $780,672 $59,936
749,199
kWh
$8,241
-
kW-mo/yr
-
TOTAL RECOMMENDED $256,578 $2,357,713 $60,414
755,179
kWh
$8,275
-
kW-mo/yr
$187,890
TOTAL IMPLEMENTED $68,689 $781,047 $60,414
755,179
kWh
$8,275
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs