ITAC Assessment: TR0035
ITAC logo
ITAC Assessment: TR0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range less than $500
k
# of Employees 10
Plant Area 894,710
ft2
Annual Production 200,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,415 2,910,000
kWh
Electricity Demand $25,312 6,452
kW-mo/yr
Waste Disposal Costs
Water Usage $14,032 58,468
Tgal
TOTAL YEARLY COSTS $236,759
RECOMMENDED SAVINGS* $125,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $22,915 $512,400 $20,237
297,600
kWh
$2,678
-
kW-mo/yr
- -
02 3.8121: Cover containers to minimize evaporative losses $101,665 $2,150,527 - - $101,665 -
03 3.7311: Maintain machines to reduce leaks $659 $507 - - $11 $648
TOTAL RECOMMENDED $125,239 $2,663,434 $20,237
297,600
kWh
$2,678
-
kW-mo/yr
$101,676 $648
TOTAL IMPLEMENTED $659 $507 - - $11 $648
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs