ITAC Assessment: TP0001
ITAC logo
ITAC Assessment: TP0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Restoration of combustion engine parts
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 890
pieces
Production Hrs. Annual 2,042
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,832 874,853
kWh
Electricity Demand $12,189 4,052
kW-mo/yr
Electricity Fees $(-1,685.0) -
Natural Gas $5,368 973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,488

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,643 $3,384 $1,915
36,049
kWh
$2,728
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $2,340 $3,500 - $2,340
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,870 $7,300 - - - $1,870
-
Tgal
-
04 2.2511: Insulate bare equipment $2,338 $1,716 - - $2,338
-
MMBtu
- -
05 2.7135: Install occupancy sensors $213 $356 $213
4,103
kWh
- - - -
06 2.7124: Make a practice of turning off lights when not needed $180 - $180
3,517
kWh
- - - -
07 2.4133: Use most efficient type of electric motors $373 $1,370 $83
1,465
kWh
$290
-
kW-mo/yr
- - -
08 3.5121: Recycle waste ink and cleanup solvent $382 $388 - - - - $382
-
gal
TOTAL RECOMMENDED $12,339 $18,014 $2,391
45,134
kWh
$5,358
-
kW-mo/yr
$2,338
-
MMBtu
$1,870
-
Tgal
$382
-
gal
TOTAL IMPLEMENTED $3,488 $5,614 $476
9,085
kWh
$2,630
-
kW-mo/yr
- - $382
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs