ITAC Assessment: TN0366
ITAC logo
ITAC Assessment: TN0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HOSPITAL STOCKINGS
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area
n/a
Annual Production 570,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $454,187 8,754,689
kWh
Natural Gas $47,453 18,373
MMBtu
Fuel Oil #6 $37,974 15,171
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $4,924 - - $2,756
-
MMBtu
$2,168
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $4,213 $720 - $2,358
-
MMBtu
$1,855
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $2,450 $718 - $1,370
-
MMBtu
$1,080
-
MMBtu
-
04 2.7123: Keep lamps and reflectors clean $10,766 $33,188 $10,363
199,297
kWh
- - $403
05 2.2121: Increase amount of condensate returned $1,712 $4,156 - $954
-
MMBtu
$758
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,977 $330 $8,977
172,626
kWh
- - -
07 2.2437: Recover waste heat from equipment $959 $1,960 - $536
-
MMBtu
$423
-
MMBtu
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $556 - - $479
-
MMBtu
$377
-
MMBtu
$(-300.0)
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,404 $4,000 $4,404
84,701
kWh
- - -
10 2.2511: Insulate bare equipment $123 $50 - $68
-
MMBtu
$55
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $259 $270 $259
4,982
kWh
- - -
TOTAL RECOMMENDED $39,343 $45,392 $24,003
461,606
kWh
$8,521
-
MMBtu
$6,716
-
MMBtu
$103
TOTAL IMPLEMENTED $27,359 $9,974 $13,381
257,327
kWh
$7,985
-
MMBtu
$6,293
-
MMBtu
$(-300.0)