Assessment Year | 1987 |
---|---|
Principal Product | WOMENS NYLON HOSIERY |
NAICS |
n/a
|
SIC | 2251: Women's Full-Length and Knee-Length Hosiery, Except Socks |
Sales Range | $10 M to 50M |
# of Employees | 480 |
Plant Area |
n/a
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $444,432 | 8,669,109 |
kWh
|
$0.051 |
Natural Gas | $158,933 | 37,871 |
MMBtu
|
$4.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,571 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $17,707 | $6,612 | - |
$17,707
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $12,978 | $760 | - |
$12,978
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,734 | - | - |
$6,934
-
MMBtu
|
$(-1,200.0) | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $5,162 | $12,300 | - |
$5,162
-
MMBtu
|
- | |
05 | 2.2163: Use minimum steam operating pressure | $3,671 | - | - |
$3,671
-
MMBtu
|
- | |
06 | 2.7226: Use computer programs to optimize hvac performance | $12,750 | $4,240 |
$12,750
250,000
kWh
|
- | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $6,113 | - |
$6,113
119,871
kWh
|
- | - | |
08 | 2.2122: Install / repair insulation on condensate lines | $731 | $107 | - |
$731
-
MMBtu
|
- | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,421 | $1,810 |
$2,421
47,479
kWh
|
- | - | |
TOTAL RECOMMENDED | $67,267 | $25,829 |
$21,284
417,350
kWh
|
$47,183
-
MMBtu
|
$(-1,200.0) | ||
TOTAL IMPLEMENTED | $53,571 | $11,719 |
$12,750
250,000
kWh
|
$42,021
-
MMBtu
|
$(-1,200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs