ITAC Assessment: TN0300
ITAC logo
ITAC Assessment: TN0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WOMENS NYLON HOSIERY
NAICS
n/a
SIC 2251: Women's Full-Length and Knee-Length Hosiery, Except Socks
Sales Range $10
M
to 50
M
# of Employees 480
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,432 8,669,109
kWh
Natural Gas $158,933 37,871
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $17,707 $6,612 - $17,707
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $12,978 $760 - $12,978
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,734 - - $6,934
-
MMBtu
$(-1,200.0)
04 2.2414: Use waste heat from hot flue gases to preheat $5,162 $12,300 - $5,162
-
MMBtu
-
05 2.2163: Use minimum steam operating pressure $3,671 - - $3,671
-
MMBtu
-
06 2.7226: Use computer programs to optimize hvac performance $12,750 $4,240 $12,750
250,000
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $6,113 - $6,113
119,871
kWh
- -
08 2.2122: Install / repair insulation on condensate lines $731 $107 - $731
-
MMBtu
-
09 2.6212: Turn off equipment during breaks, reduce operating time $2,421 $1,810 $2,421
47,479
kWh
- -
TOTAL RECOMMENDED $67,267 $25,829 $21,284
417,350
kWh
$47,183
-
MMBtu
$(-1,200.0)
TOTAL IMPLEMENTED $53,571 $11,719 $12,750
250,000
kWh
$42,021
-
MMBtu
$(-1,200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs