ITAC Assessment: TN0250
ITAC logo
ITAC Assessment: TN0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ASPHALT
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area
n/a
Annual Production 110,000
ton
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,659 930,832
kWh
Natural Gas $139,276 28,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,378

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $30,492 $4,000 $30,492
448,417
kWh
02 2.2511: Insulate bare equipment $9,426 $300 $9,426
138,628
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,460 $300 $5,460
80,305
kWh
TOTAL RECOMMENDED $45,378 $4,600 $45,378
667,350
kWh
TOTAL IMPLEMENTED $45,378 $4,600 $45,378
667,350
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs