ITAC Assessment: TN0167
ITAC logo
ITAC Assessment: TN0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WOODEN CABINETS
NAICS
n/a
SIC 2517: Wood Television, Radio, Phonograph, and Sewing Machine Cabinets
Sales Range n/a
# of Employees 1,500
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $729,733 15,715,123
kWh
Natural Gas $67,504 16,018
MMBtu
Fuel Oil #2 $216,832 29,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $310,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Fuel Oil #2 Savings
01 2.7314: Reduce ventilation air $23,801 $11,000 - $23,801
-
MMBtu
02 3.6123: Burn wood by-products for heat $250,513 $1,000,000 $67,058
-
MMBtu
$183,455
-
MMBtu
03 2.7212: Install or upgrade insulation on hvac distribution systems $30,929 $32,300 $8,287
-
MMBtu
$22,642
-
MMBtu
04 2.7314: Reduce ventilation air $5,074 $18,612 $1,360
-
MMBtu
$3,714
-
MMBtu
TOTAL RECOMMENDED $310,317 $1,061,912 $76,705
-
MMBtu
$233,612
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs