ITAC Assessment: TN0123
ITAC logo
ITAC Assessment: TN0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PAPERBOARD
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 75,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,723,713 46,339,098
kWh
Natural Gas $2,250,652 713,528
MMBtu
Fuel Oil #2 $230,074 78,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $167,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2135: Repair and eliminate steam leaks $30,377 $1,280 - $27,540
-
MMBtu
$2,837
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,019 $2,840 $1,019
33,998
kWh
- -
03 2.2113: Repair or replace steam traps $10,191 $480 - $9,239
-
MMBtu
$952
-
MMBtu
04 2.2511: Insulate bare equipment $26,503 $3,460 - $24,028
-
MMBtu
$2,475
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $2,334 $230 - $2,116
-
MMBtu
$218
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $24,808 $200 - $22,507
-
MMBtu
$2,301
-
MMBtu
07 2.2122: Install / repair insulation on condensate lines $72,394 $7,328 - $65,634
-
MMBtu
$6,760
-
MMBtu
TOTAL RECOMMENDED $167,626 $15,818 $1,019
33,998
kWh
$151,064
-
MMBtu
$15,543
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs