Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HEALTH CARE PRODUCTS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,492 6,635,111
kWh
Natural Gas $45,066 13,349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7494: Install storm windows and doors $2,553 $11,186 $1,603
64,771
kWh
$950
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $926 $3,450 - $926
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $574 $200 - $574
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $1,816 $6,885 $1,816
70,047
kWh
-
TOTAL RECOMMENDED $5,869 $21,721 $3,419
134,818
kWh
$2,450
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs