Assessment Year | 2005 |
---|---|
Principal Product | Mattress foam |
NAICS | 325212: Synthetic Rubber Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
250,000
ft2
|
Annual Production | 10,000
lb
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,134 | 2,746,257 |
kWh
|
$0.067 |
Electricity Demand | $67,128 | 14,278 |
kW-mo/yr
|
$4.70 |
Natural Gas | $34,508 | 4,229 |
MMBtu
|
$8.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,888 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,613 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $18,313 | - | - | - | $18,313 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,480 | $190 |
$9,830
159,608
kWh
|
$1,650
-
kW-mo/yr
|
- | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,970 | - |
$2,290
37,152
kWh
|
$680
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,140 | - |
$1,830
29,753
kWh
|
$310
-
kW-mo/yr
|
- | - | |
05 | 2.4238: Do not use compressed air for personal cooling | $1,595 | - |
$595
9,673
kWh
|
$1,000
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $800 | $85 | - | - | - |
$800
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $665 | $200 | - | - | - |
$665
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $395 | $100 |
$395
6,412
kWh
|
- | - | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $275 | - |
$75
1,209
kWh
|
$200
-
kW-mo/yr
|
- | - | |
10 | 2.2511: Insulate bare equipment | $255 | $360 | - | - | - |
$255
-
MMBtu
|
|
TOTAL RECOMMENDED | $38,888 | $935 |
$15,015
243,807
kWh
|
$3,840
-
kW-mo/yr
|
$18,313 |
$1,720
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,613 | $935 |
$14,940
242,598
kWh
|
$3,640
-
kW-mo/yr
|
$18,313 |
$1,720
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs