ITAC Assessment: TA0039
ITAC logo
ITAC Assessment: TA0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aseptic Packaging
NAICS
n/a
SIC 2898:
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 90,000
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 6,264
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,035,206 20,244,000
kWh
Electricity Demand $433,989 47,745
kW-mo/yr
Natural Gas $59,581 14,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7224: Reduce space conditioning during non-working hours $49,940 - $49,940
972,274
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,330 - $8,310
161,800
kWh
$2,020
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,515 - $6,515
126,840
kWh
- -
04 2.4314: Use synthetic lubricant $5,770 - $4,290
83,512
kWh
$1,480
-
kW-mo/yr
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $6,290 - $6,290
122,460
kWh
- -
06 2.2511: Insulate bare equipment $4,580 - - - $4,580
07 2.6218: Turn off equipment when not in use $3,840 - $3,840
74,790
kWh
- -
08 2.7124: Make a practice of turning off lights when not needed $2,805 - $1,675
37,645
kWh
$1,130
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $2,640 - $2,640
51,640
kWh
- -
TOTAL RECOMMENDED $92,710 - $83,500
1,630,961
kWh
$4,630
-
kW-mo/yr
$4,580
TOTAL IMPLEMENTED $88,130 - $83,500
1,630,961
kWh
$4,630
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs