ITAC Assessment: SU0381
ITAC logo
ITAC Assessment: SU0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Point of Sale Systems
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3578: Calculating and Accounting Machines, Except Electronic Computers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 245,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,206 2,528,269
kWh
Electricity Demand $82,503 8,548
kW-mo/yr
Electricity Fees $55,732 -
Natural Gas $5,871 993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $2,133 - $1,264
16,200
kWh
$869
-
kW-mo/yr
- -
02 2.7122: Disconnect ballasts $2,373 - $1,562
20,020
kWh
$811
-
kW-mo/yr
- -
03 2.4314: Use synthetic lubricant $1,717 - $1,138
14,588
kWh
$579
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $452 $211 $75
963
kWh
$13
-
kW-mo/yr
$250 $114
05 3.1161: Eliminate/reduce an operation $4,789 $5,450 $(-753.0)
(-9,660)
kWh
$(-347.0)
-
kW-mo/yr
$2,025 $3,864
06 2.4321: Upgrade obsolete equipment $446 $958 $381
4,888
kWh
$65
-
kW-mo/yr
- -
07 2.6211: Conserve energy by efficient use of vending machines $460 $950 $460
5,903
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $17,394 $50,904 $14,036
179,945
kWh
$3,358
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,764 $58,473 $18,163
232,847
kWh
$5,348
-
kW-mo/yr
$2,275 $3,978
TOTAL IMPLEMENTED $22,142 $52,073 $16,894
216,584
kWh
$4,884
-
kW-mo/yr
$250 $114
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs