ITAC Assessment: SU0356
ITAC logo
ITAC Assessment: SU0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Deli Meats, Hams, Sausage and Hot Dogs
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 169,000
ft2
Annual Production 57,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,534 18,128,613
kWh
Electricity Demand $284,955 36,712
kW-mo/yr
Natural Gas $777,929 190,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $1,526 - - - $1,526
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $609 - $609
32,033
kWh
- - - -
03 2.2414: Use waste heat from hot flue gases to preheat $128,704 $104,500 - - $128,704
-
MMBtu
- -
04 3.1161: Eliminate/reduce an operation $3,970 $2,341 $(-1,846.0)
(-97,200)
kWh
$(-280.0)
-
kW-mo/yr
- $2,645 $3,451
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,282 $3,539 $3,079
162,060
kWh
$1,723
-
kW-mo/yr
- $150 $330
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,768 $1,900 $2,768
145,670
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $637 $472 $73
3,855
kWh
$41
-
kW-mo/yr
- $382 $141
08 2.2136: Install / repair insulation on steam lines $1,264 $951 - - $1,264
-
MMBtu
- -
09 2.7135: Install occupancy sensors $577 $715 $577
30,353
kWh
- - - -
TOTAL RECOMMENDED $145,337 $114,418 $5,260
276,771
kWh
$1,484
-
kW-mo/yr
$131,494
-
MMBtu
$3,177 $3,922
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs