ITAC Assessment: SU0308
ITAC logo
ITAC Assessment: SU0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Frozen Dough
NAICS 424420: Packaged Frozen Food Merchant Wholesalers
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,656
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,979 6,802,893
kWh
Electricity Demand $174,427 17,437
kW-mo/yr
Electricity Fees $60,405 -
Natural Gas $165,815 21,368
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 3.4145: Use magnetic technology to treat water $8,509 - - - $8,509
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,204 $698 $8,204
57,374
kWh
- -
03 2.7135: Install occupancy sensors $8,338 $1,725 $8,338
58,308
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,713 $625 $2,261
15,808
kWh
$452
-
kW-mo/yr
-
05 2.6211: Conserve energy by efficient use of vending machines $628 $641 $628
4,389
kWh
- -
06 2.4112: Install soft-start to eliminate nuisance trips $16,654 $27,750 - $16,654
-
kW-mo/yr
-
TOTAL RECOMMENDED $45,046 $31,439 $19,431
135,879
kWh
$17,106
-
kW-mo/yr
$8,509
TOTAL IMPLEMENTED $10,917 $1,323 $10,465
73,182
kWh
$452
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs