ITAC Assessment: SU0149
ITAC logo
ITAC Assessment: SU0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Product safety and performance testing
NAICS
n/a
SIC 8734: Testing Laboratories
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,191 2,236,964
kWh
Natural Gas $109,967 14,948
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $405,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9121: Install wind powered electric generator $360,580 $1,153,710 $360,580
2,236,064
kWh
- -
02 2.2437: Recover waste heat from equipment $30,833 $30,000 - - $30,833
-
MMBtu
03 2.7135: Install occupancy sensors $7,864 $4,382 $7,864
49,582
kWh
- -
04 2.3212: Optimize plant power factor $3,295 $6,573 - $3,295
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,888 $500 - - $2,888
-
MMBtu
TOTAL RECOMMENDED $405,460 $1,195,165 $368,444
2,285,646
kWh
$3,295
-
kW-mo/yr
$33,721
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs