ITAC Assessment: SF0643
ITAC logo
ITAC Assessment: SF0643
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range greater than $500
M
# of Employees 500
Plant Area 2,500,000
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,796,580 17,013,632
kWh
Electricity Demand $1,145,999 39,324
kW-mo/yr
Natural Gas $257,164 12,813
MMBtu
TOTAL YEARLY COSTS $4,199,743
RECOMMENDED SAVINGS* $2,042,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,860 $1,920 $10,860
66,067
kWh
- - - -
02 2.4239: Eliminate or reduce compressed air usage $41,007 $1,080 $28,381
172,635
kWh
$12,626
-
kW-mo/yr
- - -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $12,481 - $12,481
75,921
kWh
- - - -
04 2.7226: Use computer programs to optimize hvac performance $21,145 $5,099 $21,145
128,619
kWh
- - - -
05 2.1224: Replace boiler $77,010 $244,130 - - $6,210
-
MMBtu
$(-1,200.0) $72,000
06 2.2511: Insulate bare equipment $818 $3,408 $818
4,977
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,662 $211,375 $44,988
273,648
kWh
- $1,674
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,070 $30,818 $6,070
36,922
kWh
- - - -
09 2.9114: Use solar heat to make electricty $1,826,449 $12,059,302 $1,826,449
11,109,785
kWh
- - - -
TOTAL RECOMMENDED $2,042,502 $12,557,132 $1,951,192
11,868,574
kWh
$12,626
-
kW-mo/yr
$7,884
-
MMBtu
$(-1,200.0) $72,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs