ITAC Assessment: SF0550
ITAC logo
ITAC Assessment: SF0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 25,700
ft2
Annual Production 3,500,000
units
Production Hrs. Annual 4,914
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,551 532,522
kWh
Electricity Demand $50,859 1,505
kW-mo/yr
Natural Gas $16,032 1,349
MMBtu
Waste Disposal Costs
Water Usage $24,446 1,204,253
Tgal
TOTAL YEARLY COSTS $151,888
RECOMMENDED SAVINGS* $24,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,782 $1,359 $4,782
42,054
kWh
- - - -
02 2.2511: Insulate bare equipment $1,259 $787 - - $1,259
-
MMBtu
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,899 $4,002 $3,899
34,289
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,809 $17,557 $5,924
52,096
kWh
$5,320
-
kW-mo/yr
- $601 $(-36.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,560 $12,365 $2,560
22,507
kWh
- - - -
TOTAL RECOMMENDED $24,309 $36,070 $17,165
150,946
kWh
$5,320
-
kW-mo/yr
$1,259
-
MMBtu
$601 $(-36.0)
TOTAL IMPLEMENTED $24,309 $36,070 $17,165
150,946
kWh
$5,320
-
kW-mo/yr
$1,259
-
MMBtu
$601 $(-36.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs