Assessment Year | 2019 |
---|---|
Principal Product | Candy |
NAICS | 311352: Confectionery Manufacturing from Purchased Chocolate |
SIC | 2067: Chewing Gum |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
300,000
ft2
|
Annual Production | 23,000,000
lb
|
Production Hrs. Annual | 5,775
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $765,795 | 9,993,509 |
kWh
|
$0.077 |
Electricity Demand | $323,718 | 18,204 |
kW-mo/yr
|
$17.78 |
Natural Gas | $243,635 | 44,378 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | $1,333,148 | |||
RECOMMENDED SAVINGS* | $197,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $147,604 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,964 | $5,000 |
$17,972
234,626
kWh
|
- | - | $(-1,008.0) | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $3,815 | $1,514 |
$3,100
40,467
kWh
|
- |
$715
-
MMBtu
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,931 | $15,969 |
$14,795
193,146
kWh
|
$7,136
-
kW-mo/yr
|
- | - | - | |
04 | 2.4313: Provide proper maintenance of motor driven equipment | $1,697 | $1,327 |
$1,697
21,158
kWh
|
- | - | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $7,042 | $7,678 | - | - |
$7,042
-
MMBtu
|
- | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $261 | $578 |
$261
3,410
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $50,599 | $153,278 |
$30,717
401,007
kWh
|
$15,286
-
kW-mo/yr
|
- | $4,688 | $(-92.0) | |
08 | 2.2511: Insulate bare equipment | $2,727 | $8,304 |
$923
12,055
kWh
|
- |
$1,804
-
MMBtu
|
- | - | |
09 | 2.4322: Use or replace with energy efficient substitutes | $36,428 | $115,019 |
$12,548
163,807
kWh
|
$6,052
-
kW-mo/yr
|
$17,828
-
MMBtu
|
- | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,140 | $26,538 |
$6,140
80,155
kWh
|
- | - | - | - | |
11 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $49,416 | $245,226 |
$35,548
464,077
kWh
|
$13,868
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $197,020 | $580,431 |
$123,701
1,613,908
kWh
|
$42,342
-
kW-mo/yr
|
$27,389
-
MMBtu
|
$3,680 | $(-92.0) | ||
TOTAL IMPLEMENTED | $147,604 | $335,205 |
$88,153
1,149,831
kWh
|
$28,474
-
kW-mo/yr
|
$27,389
-
MMBtu
|
$3,680 | $(-92.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs