ITAC Assessment: SF0499
ITAC logo
ITAC Assessment: SF0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Machine Components
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 65,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 8,076
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,733 1,920,177
kWh
Electricity Demand $104,648 3,636
kW-mo/yr
Natural Gas $2,463 254
MMBtu
TOTAL YEARLY COSTS $306,843
RECOMMENDED SAVINGS* $120,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $9,800 - $9,800
94,211
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,955 - $7,155
68,782
kWh
- - $(-1,200.0) -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $600 - - - $600 - -
04 2.4323: Use optimum size and capacity equipment $18,778 $30,000 $13,617
130,909
kWh
$5,161
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,191 $12,954 $3,979
38,256
kWh
$4,014
-
kW-mo/yr
- $495 $(-297.0)
06 2.9114: Use solar heat to make electricty $77,403 $434,700 $43,759
420,682
kWh
$33,644
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $120,727 $477,654 $78,310
752,840
kWh
$42,819
-
kW-mo/yr
$600 $(-705.0) $(-297.0)
TOTAL IMPLEMENTED $120,127 $477,654 $78,310
752,840
kWh
$42,819
-
kW-mo/yr
- $(-705.0) $(-297.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs