ITAC Assessment: SF0489
ITAC logo
ITAC Assessment: SF0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $50
M
to 100
M
# of Employees 9
Plant Area 771,000
ft2
Annual Production 9,000
units
Production Hrs. Annual 6,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,321 3,389,813
kWh
Electricity Demand $23,856 1,065
kW-mo/yr
Electricity Fees $19,934 -
Natural Gas $245,729 25,553
MMBtu
TOTAL YEARLY COSTS $624,840
RECOMMENDED SAVINGS* $53,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,585

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $29,223 $350 $29,223
298,868
kWh
- -
02 2.2511: Insulate bare equipment $3,011 $3,675 - - $3,011
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,283 $39,636 $18,449
188,681
kWh
$834
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $2,079 $8,593 $1,985
20,296
kWh
$94
-
kW-mo/yr
-
TOTAL RECOMMENDED $53,596 $52,254 $49,657
507,845
kWh
$928
-
kW-mo/yr
$3,011
-
MMBtu
TOTAL IMPLEMENTED $50,585 $48,579 $49,657
507,845
kWh
$928
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs