ITAC Assessment: SF0322
ITAC logo
ITAC Assessment: SF0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 11
Plant Area 163,350
ft2
Annual Production 300,000
ton
Production Hrs. Annual 1,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,347 1,586,603
kWh
Electricity Demand $122,556 9,897
kW-mo/yr
Natural Gas $784,681 118,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $7,560 $660 - - $7,560
-
MMBtu
02 2.2511: Insulate bare equipment $19,058 $11,866 - - $19,058
-
MMBtu
03 2.8114: Change rate schedules or other changes in utility service $31 $29,800 $31
-
kWh
- -
04 2.4133: Use most efficient type of electric motors $462 $2,393 $1
14
kWh
$461
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $1 $1,698 - - $1
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19 $24,854 $10
106
kWh
$9
-
kW-mo/yr
-
07 2.7134: Use photocell controls $237 $345 $113
1
kWh
$124
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $509 $1,320 $364
3
kWh
$145
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4 $15,259 $2
25
kWh
$2
-
kW-mo/yr
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $527 $1,445 $255
2
kWh
$272
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,408 $89,640 $776
151
kWh
$1,013
-
kW-mo/yr
$26,619
-
MMBtu
TOTAL IMPLEMENTED $27,371 $85,177 $157
146
kWh
$596
-
kW-mo/yr
$26,618
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs