Assessment Year | 2006 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 11 |
Plant Area |
163,350
ft2
|
Annual Production | 300,000
ton
|
Production Hrs. Annual | 1,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,347 | 1,586,603 |
kWh
|
$0.10 |
Electricity Demand | $122,556 | 9,897 |
kW-mo/yr
|
$12.38 |
Natural Gas | $784,681 | 118,420 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,408 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $7,560 | $660 | - | - |
$7,560
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $19,058 | $11,866 | - | - |
$19,058
-
MMBtu
|
|
03 | 2.8114: Change rate schedules or other changes in utility service | $31 | $29,800 |
$31
-
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $462 | $2,393 |
$1
14
kWh
|
$461
-
kW-mo/yr
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $1 | $1,698 | - | - |
$1
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19 | $24,854 |
$10
106
kWh
|
$9
-
kW-mo/yr
|
- | |
07 | 2.7134: Use photocell controls | $237 | $345 |
$113
1
kWh
|
$124
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $509 | $1,320 |
$364
3
kWh
|
$145
-
kW-mo/yr
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4 | $15,259 |
$2
25
kWh
|
$2
-
kW-mo/yr
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $527 | $1,445 |
$255
2
kWh
|
$272
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $28,408 | $89,640 |
$776
151
kWh
|
$1,013
-
kW-mo/yr
|
$26,619
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,371 | $85,177 |
$157
146
kWh
|
$596
-
kW-mo/yr
|
$26,618
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs