Assessment Year | 2004 |
---|---|
Principal Product | Medical Systems |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $1 M to 5M |
# of Employees | 55 |
Plant Area |
17,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $196,070 | 2,035,800 |
kWh
|
$0.096 |
Electricity Demand | $39,459 | 3,076 |
kW-mo/yr
|
$12.83 |
Natural Gas | $23,116 | 2,757 |
MMBtu
|
$8.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,213 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,939 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $2,378 | - | - |
$2,378
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,565 | $7,217 |
$12,539
130,197
kWh
|
$1,026
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,204 | $4,525 |
$5,204
54,037
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,996 | $5,126 |
$4,226
42,711
kWh
|
$770
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $159 | $250 |
$99
1,024
kWh
|
$60
-
kW-mo/yr
|
|
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $23,382 | $48,990 |
$15,460
160,524
kWh
|
$7,922
-
kW-mo/yr
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $529 | $3,076 |
$448
4,653
kWh
|
$81
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $50,213 | $69,184 |
$37,976
393,146
kWh
|
$12,237
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $20,939 | $12,343 |
$16,765
172,908
kWh
|
$4,174
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs