ITAC Assessment: SF0295
ITAC logo
ITAC Assessment: SF0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Medical Systems
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 17,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,070 2,035,800
kWh
Electricity Demand $39,459 3,076
kW-mo/yr
Natural Gas $23,116 2,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $2,378 - - $2,378
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,565 $7,217 $12,539
130,197
kWh
$1,026
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,204 $4,525 $5,204
54,037
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,996 $5,126 $4,226
42,711
kWh
$770
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $159 $250 $99
1,024
kWh
$60
-
kW-mo/yr
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $23,382 $48,990 $15,460
160,524
kWh
$7,922
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $529 $3,076 $448
4,653
kWh
$81
-
kW-mo/yr
TOTAL RECOMMENDED $50,213 $69,184 $37,976
393,146
kWh
$12,237
-
kW-mo/yr
TOTAL IMPLEMENTED $20,939 $12,343 $16,765
172,908
kWh
$4,174
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs