| Assessment Year | 2002 |
|---|---|
| Principal Product | Heat Set Ink |
| NAICS |
n/a
|
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 23 |
| Plant Area |
60,000
ft2
|
| Annual Production | 24,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $150,507 | 1,250,655 |
kWh
|
$0.12 |
| Electricity Demand | $49,705 | 5,196 |
kW-mo/yr
|
$9.57 |
| Natural Gas | $26,397 | 3,943 |
MMBtu
|
$6.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2314: Replace heat treating oven with more efficient unit | $3,149 | $11,455 | n/a |
$3,149
26,528
kWh
|
- |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,939 | - | n/a |
$4,939
31,967
kWh
|
- |
| 03 | 2.7134: Use photocell controls | $4,330 | $6,240 | n/a |
$4,330
28,704
kWh
|
- |
| 04 | 2.4133: Use most efficient type of electric motors | $3,657 | $3,491 | n/a |
$3,657
24,241
kWh
|
- |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,588 | $3,019 | n/a |
$1,588
9,527
kWh
|
- |
| 06 | 3.5217: Reuse / recycle/ sell paper products | $4,500 | $500 | n/a | - |
$4,500
-
lb
|
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,923 | $17,600 | n/a | - |
$6,923
-
lb
|
| TOTAL RECOMMENDED | $29,086 | $42,305 |
$17,663
120,967
kWh
|
$11,423
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs