ITAC Assessment: SF0219
ITAC logo
ITAC Assessment: SF0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product calf milk replacer
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 76,000
ft2
Annual Production 17,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,061 883,888
kWh
Natural Gas $2,530 248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,206 - $1,206
12,843
kWh
-
02 2.2314: Replace heat treating oven with more efficient unit $5,816 $5,705 $5,816
(-21,804)
kWh
-
03 2.2611: Moderate cooling tower outlet temperature $415 $406 $415
3,749
kWh
-
04 2.7132: Install timers on light switches in little used areas $529 $840 $529
4,774
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,695 $11,140 $1,695
15,312
kWh
-
06 4.132: Purchase new equipment to reduce material use / cost $14,216 $507 - $14,216
TOTAL RECOMMENDED $23,877 $18,598 $9,661
14,874
kWh
$14,216
TOTAL IMPLEMENTED $22,182 $7,458 $7,966
(-438)
kWh
$14,216
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs