ITAC Assessment: SF0203
ITAC logo
ITAC Assessment: SF0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Molded Plastic
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $581,093 7,444,041
kWh
Natural Gas $771 95
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $14,281 $12,335 n/a $14,281
183,421
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $102,269 $222,598 n/a $102,269
1,681,898
kWh
-
03 2.7135: Install occupancy sensors $628 $1,440 n/a $628
8,060
kWh
-
04 2.7135: Install occupancy sensors $4,519 $11,900 n/a $4,519
58,044
kWh
-
05 2.7132: Install timers on light switches in little used areas $2,121 $6,250 n/a $2,121
27,244
kWh
-
06 3.5217: Reuse / recycle/ sell paper products $4,350 - n/a - $4,350
-
lb
TOTAL RECOMMENDED $128,168 $254,523 $123,818
1,958,667
kWh
$4,350
-
lb
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs