ITAC Assessment: SF0170
ITAC logo
ITAC Assessment: SF0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection Molded Plastic Parts, Industrial Molds
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 35,000
ft2
Annual Production 312
units
Production Hrs. Annual 4,992
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,739 565,651
kWh
Electricity Demand $8,761 2,037
kW-mo/yr
Natural Gas $1,415 201
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $2,306 $2,000 $2,047
25,205
kWh
$259
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $4,073 $2,652 $3,831
47,773
kWh
$242
-
kW-mo/yr
-
03 2.7144: Install spectral reflectors / delamp $4,245 $7,048 $3,687
45,721
kWh
$558
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $787 $1,317 $787
9,672
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,261 $9,625 $2,053
25,498
kWh
$208
-
kW-mo/yr
-
06 4.111: Add equipment/ operators to reduce production bottleneck $91,097 $280,750 $3,344
41,325
kWh
$393
-
kW-mo/yr
$87,360
TOTAL RECOMMENDED $104,769 $303,392 $15,749
195,194
kWh
$1,660
-
kW-mo/yr
$87,360
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs