Assessment Year | 1999 |
---|---|
Principal Product | Injection Molded Plastic Parts, Industrial Molds |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
35,000
ft2
|
Annual Production | 312
units
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,739 | 565,651 |
kWh
|
$0.081 |
Electricity Demand | $8,761 | 2,037 |
kW-mo/yr
|
$4.30 |
Natural Gas | $1,415 | 201 |
MMBtu
|
$7.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $2,306 | $2,000 |
$2,047
25,205
kWh
|
$259
-
kW-mo/yr
|
- | |
02 | 2.2511: Insulate bare equipment | $4,073 | $2,652 |
$3,831
47,773
kWh
|
$242
-
kW-mo/yr
|
- | |
03 | 2.7144: Install spectral reflectors / delamp | $4,245 | $7,048 |
$3,687
45,721
kWh
|
$558
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $787 | $1,317 |
$787
9,672
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,261 | $9,625 |
$2,053
25,498
kWh
|
$208
-
kW-mo/yr
|
- | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $91,097 | $280,750 |
$3,344
41,325
kWh
|
$393
-
kW-mo/yr
|
$87,360 | |
TOTAL RECOMMENDED | $104,769 | $303,392 |
$15,749
195,194
kWh
|
$1,660
-
kW-mo/yr
|
$87,360 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs