| Assessment Year | 1999 |
|---|---|
| Principal Product | Carpet Underlay |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
100,000
ft2
|
| Annual Production | 21,700,000
lb
|
| Production Hrs. Annual | 4,335
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,015 | 1,661,196 |
kWh
|
$0.048 |
| Electricity Demand | $121,744 | 2,276 |
kW-mo/yr
|
$53.49 |
| Natural Gas | $40,049 | 6,906 |
MMBtu
|
$5.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,764 | $144 | n/a |
$1,594
33,118
kWh
|
$1,170
-
kW-mo/yr
|
- | - | - |
| 02 | 2.2511: Insulate bare equipment | $434 | $167 | n/a |
$434
3,517
kWh
|
- | - | - | - |
| 03 | 2.2511: Insulate bare equipment | $553 | $881 | n/a | - | - |
$553
-
MMBtu
|
- | - |
| 04 | 2.4133: Use most efficient type of electric motors | $815 | $1,628 | n/a |
$527
8,206
kWh
|
$288
-
kW-mo/yr
|
- | - | - |
| 05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $9,385 | $250 | n/a | - | - | - |
$9,385
-
lb
|
- |
| 06 | 4.444: Install system to collect scrap | $11,629 | $15,500 | n/a |
$(-1,381.0)
(-11,430)
kWh
|
- | - | - | $13,010 |
| 07 | 4.652: Replace existing equipment with more suitable substitutes | $25,641 | $41,432 | n/a | - | - | - |
$9,385
-
lb
|
$16,256 |
| TOTAL RECOMMENDED | $51,221 | $60,002 |
$1,174
33,411
kWh
|
$1,458
-
kW-mo/yr
|
$553
-
MMBtu
|
$18,770
-
lb
|
$29,266 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs