Assessment Year | 1999 |
---|---|
Principal Product | Carpet Underlay |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
100,000
ft2
|
Annual Production | 21,700,000
lb
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,015 | 1,661,196 |
kWh
|
$0.048 |
Electricity Demand | $121,744 | 2,276 |
kW-mo/yr
|
$53.49 |
Natural Gas | $40,049 | 6,906 |
MMBtu
|
$5.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,764 | $144 | n/a |
$1,594
33,118
kWh
|
$1,170
-
kW-mo/yr
|
- | - | - |
02 | 2.2511: Insulate bare equipment | $434 | $167 | n/a |
$434
3,517
kWh
|
- | - | - | - |
03 | 2.2511: Insulate bare equipment | $553 | $881 | n/a | - | - |
$553
-
MMBtu
|
- | - |
04 | 2.4133: Use most efficient type of electric motors | $815 | $1,628 | n/a |
$527
8,206
kWh
|
$288
-
kW-mo/yr
|
- | - | - |
05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $9,385 | $250 | n/a | - | - | - |
$9,385
-
lb
|
- |
06 | 4.444: Install system to collect scrap | $11,629 | $15,500 | n/a |
$(-1,381.0)
(-11,430)
kWh
|
- | - | - | $13,010 |
07 | 4.652: Replace existing equipment with more suitable substitutes | $25,641 | $41,432 | n/a | - | - | - |
$9,385
-
lb
|
$16,256 |
TOTAL RECOMMENDED | $51,221 | $60,002 |
$1,174
33,411
kWh
|
$1,458
-
kW-mo/yr
|
$553
-
MMBtu
|
$18,770
-
lb
|
$29,266 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs