ITAC Assessment: SF0120
ITAC logo
ITAC Assessment: SF0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 128,000
ft2
Annual Production 27,000
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,280 328,839
kWh
Electricity Demand $4,944 1,195
kW-mo/yr
Natural Gas $880 128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,864 $7,560 $2,313
26,084
kWh
$551
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $105 $303 $85
879
kWh
$20
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $277 $677 $224
2,638
kWh
$53
-
kW-mo/yr
- -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,187 $2,400 $959
10,844
kWh
$228
-
kW-mo/yr
- -
05 3.5313: Increase amount of waste recovered for resale $9,100 $250 - - $9,100
-
lb
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,766 $18,000 - - $6,766
-
lb
-
07 4.321: Optimize production lot sizes and inventories $41,090 $6,912 - - - $41,090
TOTAL RECOMMENDED $61,389 $36,102 $3,581
40,445
kWh
$852
-
kW-mo/yr
$15,866
-
lb
$41,090
TOTAL IMPLEMENTED $59,925 $33,025 $2,398
26,963
kWh
$571
-
kW-mo/yr
$15,866
-
lb
$41,090
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs