ITAC Assessment: SF0051
ITAC logo
ITAC Assessment: SF0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Cartons
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 370,000
ft2
Annual Production 680
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $558,421 6,570,926
kWh
Natural Gas $179,562 53,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $392,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,721 $1,802 $1,721
20,223
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,730 $12,058 $4,730
55,686
kWh
-
03 2.2136: Install / repair insulation on steam lines $383 $220 - $383
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $827 $100 - $827
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,798 $800 - $1,798
-
MMBtu
06 2.2437: Recover waste heat from equipment $5,459 $9,350 - $5,459
-
MMBtu
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $377,412 $534,700 $521,921
6,177,902
kWh
$(-144,509.0)
-
MMBtu
TOTAL RECOMMENDED $392,330 $559,030 $528,372
6,253,811
kWh
$(-136,042.0)
-
MMBtu
TOTAL IMPLEMENTED $9,459 $14,980 $6,451
75,909
kWh
$3,008
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs