ITAC Assessment: SF0007
ITAC logo
ITAC Assessment: SF0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 650
Plant Area 96,000
ft2
Annual Production 4,800
ton
Production Hrs. Annual 7,056
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,088,250 11,963,072
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,378

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8114: Change rate schedules or other changes in utility service $80,058 $180,000 $80,058
-
kWh
02 2.2511: Insulate bare equipment $71,048 $21,073 $71,048
781,067
kWh
03 2.2511: Insulate bare equipment $6,622 $1,988 $6,622
72,685
kWh
04 2.4133: Use most efficient type of electric motors $22,511 $12,625 $22,511
247,362
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,025 $900 $2,025
27,843
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,172 $5,236 $5,172
56,858
kWh
TOTAL RECOMMENDED $187,436 $221,822 $187,436
1,185,815
kWh
TOTAL IMPLEMENTED $107,378 $41,822 $107,378
1,185,815
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs